Custom Business Signs Toronto
GTA Permit Hub/Burlington

Burlington Sign Permit Guide (2026)

Installing a commercial sign in Burlington requires strict adherence to local bylaws. Whether you are opening a new retail store, installing an illuminated storefront sign, or mounting a corporate pylon, this 2026 guide covers the exact requirements, timelines, and municipal fees you need to prepare for.

Get a Fast Track Permit Quote

2026 Permit Fees

Sign TypeBase Cost Estimator
Fascia/Wall Signs$380 base + $20 per sq meter
Ground Signs$500 base + $28 per sq meter
Awning Signs$275 base fee
* Costs are approximate 2026 base fees. Accurate scaling fees depend on total sign square meterage and property zoning.

Application Requirements

  • 1

    Sign Permit Application Form

  • 2

    Elevation drawings with sign dimensions, colours, materials, and illumination details

  • 3

    Site plan showing sign location and proximity to lot lines

  • 4

    Letter of authorization from the property owner or management company

  • 5

    Electrical permits for any illuminated signage components

Processing Time

10-20 business days

If your property is in a Heritage Conservation District or requires minor variances, add an additional 10-15 business days to your timeline.

Avoid Rejection

In Burlington, the most common reasons examiners deny applications include:

  • •Sign does not meet Downtown Burlington design standards
  • •Pylon sign height exceeds maximum allowable limits for the commercial zone
  • •Missing companion electrical permit from the Electrical Safety Authority

Our team submits 100% compliant applications. Let us handle it.

Municipal Authority

Burlington Building and By-law

905-335-7600

Ready to build your sign in Burlington?

905-597-8635