Custom Business Signs Toronto

Markham Sign Permit Guide (2026)

Installing a commercial sign in Markham requires strict adherence to local bylaws. Whether you are opening a new retail store, installing an illuminated storefront sign, or mounting a corporate pylon, this 2026 guide covers the exact requirements, timelines, and municipal fees you need to prepare for.

Get a Fast Track Permit Quote

2026 Permit Fees

Sign TypeBase Cost Estimator
Fascia/Wall Signs$390 base + $20 per sq meter
Ground/Pylon Signs$520 base + $30 per sq meter
Directory Signs$350 base fee
* Costs are approximate 2026 base fees. Accurate scaling fees depend on total sign square meterage and property zoning.

Application Requirements

  • 1

    Building Permit Application for Sign Installation

  • 2

    Completed sign design drawings with dimensions, materials, and colour specifications

  • 3

    Site plan showing sign placement relative to lot lines and adjacent buildings

  • 4

    Structural engineering report for signs exceeding 5 sq meters or projecting signs

  • 5

    Landlord authorization letter (for tenants)

Processing Time

15-25 business days

If your property is in a Heritage Conservation District or requires minor variances, add an additional 10-15 business days to your timeline.

Avoid Rejection

In Markham, the most common reasons examiners deny applications include:

  • •Sign area exceeds the maximum permitted coverage for the building facade
  • •Non-compliance with Markham's urban design guidelines in heritage or downtown areas
  • •Insufficient engineering documentation for heavy or cantilevered installations

Our team submits 100% compliant applications. Let us handle it.

Municipal Authority

Markham Building Standards

905-477-7000

Official Permitting Portal →

Ready to build your sign in Markham?

905-597-8635